
Swing Gate Motors Kenya — Compare swing gate motors in Kenya for single and double leaves, including pillar condition, clearance, backup power and installation scope.
For a swing gate, the choice of motor depends on the leaf geometry and mounting points as well as the weight of the gate. The survey should check the hinges, pillars, opening direction and available space before you compare quotes.
Look at the gate through its entire swing
Show where cars stop and where people walk. Point out sloping ground and any recent hinge or pillar repairs. For a solid gate exposed to wind, tell the installer how the gate behaves in gusty conditions. Ask the surveyor to explain which mechanical work should happen before automation.
Specify how the entrance should operate
On a double gate, confirm whether both leaves always open and how deliveries and pedestrians will be admitted. Ask whether the proposed operator works with your existing intercom and whether an outage would require backup power or an approved manual release procedure.
Read the proposal before approving equipment
Request the exact motor model, any bracket or pillar work, accessories, safety testing and written support terms. If the proposal assumes a gate or driveway alteration, ask who will complete it and when.
Swing Gate Motors Kenya: what to check before approving the quote
Check the pillars and mounting geometry
Ask the installer to inspect where an actuator would attach and whether the pillar needs repair or reinforcement. Photos help with an initial discussion, but measurements and the manufacturer’s installation requirements should decide whether the model fits.
Plan for wind and driveway slope
A solid leaf on an exposed entrance can behave differently from an open metal frame. Show where the driveway rises or drops through the swing and where vehicles wait, including a delivery vehicle that may need extra room.
Agree how each leaf should operate
Describe whether residents normally open the full driveway or need separate pedestrian access. On a double gate, tell the installer if the leaves overlap and ask how their movement will be coordinated during normal use.
Test backup and visitor controls
Ask how the quoted equipment will behave in an outage and how the authorised person can request help. At handover, test routine entry with the intercom or guard controls as well as the supplied remotes.
See the ZES swing gate automation guide and consult the FAAC product information for additional context before specifying equipment or procedures.
Contact ZES with the site location, gate type and project requirements.

Frequently asked questions
Can you automate an existing pair of leaves?
Have the surveyor check both leaves individually and record any movement at each hinge or pillar. Ask what the opening should look like when both sides are working properly. If one leaf is regularly left closed, include that in the brief as it may change what the installer proposes for day-to-day vehicle and pedestrian access.
What should a project manager check before installation?
Confirm which trade handles reinforcement, electrical work, and restoration of any paving. Agree on when the installer will need the entrance clear and who will arrange temporary access. Ask for the operator model on the quote so the site team can keep the right documents after handover.
What should you have ready for an enquiry?
Send the exact location and clear photos from both sides of the entrance. Describe the normal users and any restrictions on site access. If equipment is already installed, include the manufacturer and model. Give the installer a contact who can explain how the entrance operates during the busiest part of the day.
What should be in the written proposal?
Ask for equipment, labour and any subcontracted work to be itemised. Agree who will test the finished system and train the people operating it. Keep the model details, the support contact and the dates of any warranty coverage with the property records, so the next service request is easy to prepare.