Eastern Bypass (Kamaki's), Karuguru Plaza, Office Suite 12, Ruiru, KenyaMonday–Friday, 8:00am–5:00pm

+254 725 345 345info@zes.co.ke

FAQ

How long does installation take?

The duration depends on the size of the site, system complexity, cabling routes, access conditions and equipment availability. The expected timeline is included in the quotation.

The duration depends on the size of the site, system complexity, cabling routes, access conditions and equipment availability. The expected timeline is included in the quotation.

Discuss this solution with ZES

Request a site assessment and a quotation designed for your property.

Request a Quote